Gallery

Other galleries

East London Line Project

East London Line Test Runs

Northbound train to Dalston station crossing the Bishopsgate bridge whilst leaving the new Shoreditch station.

The East London Railway project was completed in January 2009 by the Balfour Beatty-Carillion Joint Venture.
The test running period was a great achievement for all those who worked hard during design, installation and static testing to see the first trains running on the refurbished line as well as the newly built extension.

Courtesy of John Thurrock.


East London Line Test Runs
East London Line Test Runs
East London Line Test Runs
East London Line Test Runs
East London Line Test Runs
East London Line Depot Commissioning
East London Line Test Runs
East London Line Commissioning
East London Line Commissioning
East London Line Commissioning
East London Line Commissioning
East London Line Commissioning
East London Line Commissioning
East London Line Depot Commissioning
East London Line Test Runs
East London Line Depot Commissioning
East London Line Depot Commissioning
East London Line Depot Commissioning
East London Line Depot Commissioning
East London Line Depot Commissioning
East London Line Test Runs