Channel Tunnel Rail Link

Installation of OCS equipment

Installation of Catenary equipment on the Open Route section of the CTRL-Section 2.

The installation team is using a special RRV (Road-Rail Vehicle) to securely work at height in dedicated baskets. The safe operation of the vehicle on the tracks is under the responsibility of the Banksman who is walking with the vehicle as it progresses on the line.


CTRL Section 2 Project
Entente Cordiale
Arrival of First ever Train at St Pancras International
Eurostar under the Barlow shed
Preparation on-board Eurostar before test runs
Review of CTRL-Section 2 project
Test Run on board Eurostar Test Train
Eurostar Test Train T&C Team
Eurostar test train at Stratford
Convoy of RRV
Installation of OCS equipment
Structure Gauge Checks
Gauge 'Hot Spots' checks
Test Track
View of London Tunnel
Multi-Purpose Gantry
Transition Slab & Ballasted Tracks
Multi Purpose Gantry (MPG)
Slab Track Team
Train Tunnel Ventilation Tests
Mauzin Train Tests
Michael Palin visits CTRL